SKU: 87079496712

Hetton Colliery Chaldron Pack

Sale price$45.90 Regular price$51.00
Save 10%

Pay in installments of $12.75 with ShopPay, AfterPay and Klarna

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Jul 23 - Jul 28

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

Hetton Colliery Chaldron PackThree wagon multi pack, NER 4T Chaldron Pack B: Hetton Colliery Railway Three ex NER P1 style Chaldrons in pre 1911 lettering. Built by George Stephenson, Hetton Colliery Railway celebrates its 200th anniversary in 2022, being the worlds first complete railway system that only utilised steam locomotives. Containing three wagons, numbered: 1518 211 1349 Each pack produced has been themed by colliery, and each waggon depicted is based on photographic

Three wagon multi-pack, NER 4T Chaldron

Pack B: Hetton Colliery Railway - Three ex-NER P1 style Chaldrons in pre-1911 lettering. Built by George Stephenson, Hetton Colliery Railway celebrates its 200th anniversary in 2022, being the world’s first complete railway system that only utilised steam locomotives.

Containing three wagons, numbered:

  • 1518
  • 211
  • 1349

Each pack produced has been themed by colliery, and each waggon depicted is based on photographic evidence and reference to colliery records to confirm lettering styles. Some packs contain just one style of waggon, while others contain mixed styles where research has shown that they operated in conjunction with each other. 

Specification List:

  • Die-cast metal chassis with plastic body. Weight of 9g unloaded.
  • Operates over minimum radius curves (371mm, 1st radius set-track)
  • Five different body designs, covering a time period from 1840 to 1978.
  • Three styles of wheel design; split spoke, star spoke and wave spoke, to a blackened 00 gauge RP25-88 profile.
  • Three styles of braking arrangement and brake handles, with different block types and the more complicated Londonderry clasp type brake.
  • Three arrangements of ‘bang-boards’.
  • Additional, removable ‘greedy boards’ (horizontal board extensions to the body) to the Shildon Works built Chaldron, giving an increased coal loading.
  • Scale width wire handrails, metal pin jaw coupling and wire/etch handbrake levers.
  • Eroded metal/plastic detail parts, including grab handles, door securing pins, chassis chain points and safety chains in metal.
  • Wagons connected via an all new link fine chain with Neodymium magnetic heads, connected at the wagon via prototypical cotter pin coupling.
  • Two extra NEM fitted magnetic couplings supplied with wagon packs to allow for fitting to locomotives and/or additional rolling stock.
  • Artwork features authentic colliery markings and numbers, accurate to time period modelled and based on actual photographic evidence where possible.
  • Additional research assistance provided by Beamish Living Museum, Bowes Railway and the North Eastern Railway Association.
Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy
SKU: 87079496712

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

4.6 ★★★★★
Based on 30 reviews
Sort
Highest Rating
Newest First
Oldest First
Product Reviews
B
Verified Purchase
Barbara E. Parks
Draper, US
★★★★★ 5
I think they look smashing ...as my British friend would say!
My goodness I absolutely love them. Yeah they're plastic but they really are lovely. Easy to put together and by the way, I'm 85 year-old young lady, and I did it all myself big deal… I hope they last a long long time because they look really spectacular on our driveway posts! Oh, and they give the needed lights that I was hoping for I really like them as you can tell. I'm heading off for a bridge game right now but tonight when the lights are on, I'll take a picture and try to add them here. I really really think they're lovely.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on April 9, 2025
A
Verified Purchase
Amazon Customer
Lowell, US
★★★★★ 5
Bright idea
Burns bright. Lasts all night. Took more time to unwrap than it did to install
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on November 3, 2025
S
Verified Purchase
Sam Rogers
Cuba, US
★★★★★ 3
Looks good but but takes work to put it together.
Parts do not fit together well. Had to take a knife to trim top to make it fit. Plastic nuts and bolts. Light works well and stays lit for hours.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on March 26, 2025
J
Verified Purchase
Just-me
Boise, US
★★★★★ 5
Looks Fantastic
Size: 1 Pack
Very easy to install, and looks very nice. It’s made from a durable composite material, not metal, but it’s built well. No one would know that it isn’t metal. On the pricier side for solar lamps, but you’re buying a quality product.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on June 6, 2024
R
Verified Purchase
Robert M.
Charlottesville, US
★★★★★ 4
Good product for the price!
Size: 1 Pack, Size: 1 Pack
This light is not bad for being a solar powered product. I have it in the area that receives most of the days sunlight as this area gets full sun (that side of the house gets blasted). The light is on for about 6-7 hours. I am thinking of buying another one. Just note that the housing is plastic.... not super high quality, but it gets the job done for the price point.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on January 4, 2021

recommand products