SKU: 19909360082

FNA-D ‘New Generation’ Nuclear Flask Carrier - Teal - Twin Pack A

Sale price$76.50 Regular price$85.00
Save 10%

Pay in installments of $21.25 with ShopPay, AfterPay and Klarna

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Jul 19 - Jul 24

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

FNA-D ‘New Generation’ Nuclear Flask Carrier - Teal - Twin Pack APack 1 11 70 9229 002 4 (w tail light) 11 70 9229 016 4 A total of forty of these striking vehicles were built in three batches for the Nuclear Decommissioning Authority (NDA) by WH Davis in the UK between 2014 and 2019, numbered 11 70 9229 001 040. They are used for carrying spent fuel from nuclear power stations and sites undergoing decommissioning to the facility at Sellafield for reprocessing or storage. The FNA D continues Accurascale's popular

Pack 1
11 70 9229 002-4 (w/tail light)
11 70 9229 016-4

A total of forty of these striking vehicles were built in three batches for the Nuclear Decommissioning Authority (NDA) by WH Davis in the UK between 2014 and 2019, numbered 11 70 9229 001-040. They are used for carrying spent fuel from nuclear power stations and sites undergoing decommissioning to the facility at Sellafield for reprocessing or storage. The FNA-D continues Accurascale's popular and well-regarded range of nuclear vehicles that includes the KUA bogie flask carrier and the PFA two-axle container flat.

The wagons, which also carry the UIC code ‘Uas’ are a like-for-like replacement for the iconic fleet of BR and Procor-built FNA nuclear flask wagons that were built between 1976 and 1988, now all scrapped. The major updates are bodysides with exposed framing and the distinctive Barber BER22.5 ‘Easy Ride’ low track force bogies. Internally the vessel support structures are designed to carry a wider range of flask designs. Accurascale has obsessively replicated these characteristic features in the smaller scale with a composite die-cast and plastic design that includes full underframe detail and brake equipment.

Despite the number of working nuclear power stations shrinking dramatically since the turn of the millennium, the FNA-D wagons can still be seen over much of the UK, usually between one and five wagons behind a pair of Direct Rail Services (DRS) locomotives. These operational sites are Hartlepool, Heysham 1 & 2, Torness and Sizewell B.

However, three closed locations are undergoing the de-fuelling process and shipping irradiated fuel rods to Sellafield: Dungeness B, Hinkley Point B and Hunterston B. Meanwhile, Valley loading point, for the former Wylfa facility on Anglesey, completed this process in 2019, but still sees irregular visits by flask trains, as does Georgemas Junction, which serves the experimental reactors at Dounreay.

    Shipping Notes
    • Free Standard Shipping on $100+ Orders to the USA.
    • Except Preorder products are shipped in 48 hours.
    • Delivery to the USA:
    1. Standard Shipping : 3-10 business days
    • If time is of the essence, please consider selecting expedited delivery for faster service.
    Exchange/Return Notes
    • We offer a 30-day return/exchange service after receiving.
    • Final sale items are not eligible for returns or exchanges.
    • To process your return/exchange, please contact us at [email protected]
    • Please click here for more details>>> Return & Exchange Policy
    SKU: 19909360082

    Discover Niche Categories That Outsell

    Top-Converting Item to Boost Your Average Order

    4.4 ★★★★★
    Based on 21 reviews
    Sort
    Highest Rating
    Newest First
    Oldest First
    Product Reviews
    J
    Verified Purchase
    judith stevens
    Whiting, US
    ★★★★★ 1
    Some of the components are plastic
    This is not a heavy duty application what so ever . One of the flanges broke . We do not recommend this product
    WAS THIS REVIEW HELPFUL?YesReportShare
    Reviewed in the United States on July 5, 2024
    K
    Verified Purchase
    Kimberly matthews
    Lexington, US
    ★★★★★ 2
    Quality control lacking
    One tee conector was missing. Nothing avaliable locally that fits.
    WAS THIS REVIEW HELPFUL?YesReportShare
    Reviewed in the United States on July 13, 2025
    A
    Verified Purchase
    Alexandra
    Los Angeles, US
    ★★★★★ 1
    It doesn’t stay in
    The pipe keeps coming out. Not worth the money. Not sturdy to hold a top table.
    WAS THIS REVIEW HELPFUL?YesReportShare
    Reviewed in the United States on February 20, 2024
    E
    Verified Purchase
    Eric
    Dallas, US
    ★★★★★ 2
    Good finish, poor hardware.
    Set screws are poor quality and are sometimes powdercoated on the exposed threads. Leads to striped hex sockets and inability to tighten properly. Durable finish as evidenced by no visible damage after throwing parts across the shop in frustration. Ended up running self tapping screws thru parts to complete assembly.
    WAS THIS REVIEW HELPFUL?YesReportShare
    Reviewed in the United States on February 26, 2024
    C
    Verified Purchase
    Carl L. Bradley
    Boise, US
    ★★★★★ 1
    Kinda flimsy…
    Thought the assembly was metal, it’s some kind of PVC.
    WAS THIS REVIEW HELPFUL?YesReportShare
    Reviewed in the United States on September 22, 2025

    recommand products